Skip to content
Audit & Certification

ISO 3834 · Welding Quality

Fusion welding processes and the importance of quality verification.

Request a quote

Welding is a special process: its quality cannot be fully verified on the finished product. ISO 3834 helps you manage it correctly, in the workshop and on site.

What is ISO 3834?

EN ISO 3834 sets out quality requirements for fusion welding of metallic materials, both in the workshop and at the installation site. It governs the correct management of the manufacturing process by welding, for every type of welded construction.

Talk to an expert

Our team guides you from quote to certificate.

Request a quote [email protected]
2 stages
Stage 1 and stage 2 certification audit
Optional
Preliminary visit (pre-audit) before certification

Who it is for

The standard is very broad and applies to a wide range of companies that weld metallic materials.

  • 01

    Pressure equipment

    Manufacturers of pressure components, systems or piping subject to national or international rules (e.g. PED, ASME).

  • 02

    Plant engineering

    Companies working in chemical, petrochemical, metallurgical and power generation plants.

  • 03

    Construction structures

    Companies that build welded structures for construction.

  • 04

    Railway sector

    Companies that manufacture or maintain welded constructions for the railway sector.

Why certify

  • Contract requirements

    Meet customers’ increasingly frequent requirement for certification to this standard.

  • Defined quality

    Define and maintain welding quality requirements within your organisation.

  • Welding as a special process

    Manage welding as a “special process”, complementing ISO 9001.

  • Support for directives

    Supports compliance with welding requirements in European directives and regulations such as the PED and the Construction Products Regulation.

Your path to certification

  1. 1

    Start

    We define the scope with you and open the certification process.

  2. 2

    Pre-auditOptional

    A preliminary visit to assess your readiness.

  3. 3

    Stage 1 audit

    Documentation review and initial visit.

  4. 4

    Stage 2 audit

    Certification audit of your management system and welding processes.

  5. 5

    Certificate issued

    The certificate is issued after a positive opinion from the AQSCERT Approval Committee.

  6. 6

    Maintaining the certificate

    Periodic surveillance audits and recertification keep the certificate valid.

Ready for the next step?

Tell us about your organisation and we will send you a clear, no-obligation quote.

Request a quote